1.Design all aspects of the central Telco room that will serve 18

advertisement

UMB Planning

Activities

By: Russell Schrotberger

Todd Pavlik

Jeremiah Irish

DJ Waring

Darryl Bartshe

Client Request

 The specific deliverables that we request of the DeVry team are as follows:

• 1.Design all aspects of the central Telco room that will serve 18 floors of the 928 building and 6 floors of the 910 building.

– A. Create a layout for Voice equipment (Lucent PBX expansion cabinets, SWBT cabinets, SWBT Dmark location, etc.)

– B. Create a layout for Data equipment (data cabinets, server locations, Xylan location, etc.)

– C. Create a layout for all other equipment (air conditioners, overhead lighting placement, cable routes, ladder tray placement, etc.)

– D. Calculate worker populations per floor to determine phone capacity and to determine the size requirements of the PBX expansion cabinets.

• 2.Research and make recommendations in a variety of areas including electrical requirements, RFP documentation, equipment inventories,

Voice and Data needs, etc.

• 3.Contact vendors regarding wiring installation and other equipment needs.

• 4.Ensuring that the central Telco room has capacity for a fast growing environment.

UMB Analysis

The project original objective was to help UMB in the planning phase of a switch room design as well as a departmental move for UMB Bank.

Scope change within the project: Employee Benefits move will not take place until May/June of 2001.

Tasks completed for UMB were to help design a main switch room for 928 building, help in research of products, create drawings of the main switch room layout and other components with Visio, gather specifications for equipment, etc.

Project Description

Finalized Floor Plan Layout’s – Drawn in Visio – note: this will included the Voice and Data capacity requirements

Project Management File for the move of the EB

Department – in MS Project ’98

Documentation of location of all terminated cable runs in Visio

Finalized Electrical Requirements for the switch room in MS Excel format

An RFP to be presented to whomever will be contracted to do the installation

Planning of new Telco Room

First we needed to complete the following tasks.

 Determine number of workstations/users

 Determine the standard equipment that we were going to use

 Provide Electrical requirements for all equipment

 Create a layout of all equipment in main telco room as well as satellite closets

 Devise a naming convention.

Floor Plan Development

First we created a template for our room

Floor Plan Development 4-16

Next, we began inserting objects into the room.

3

4

5

6

1

2

7

8

24

25

26

27

28

19

20

21

22

23

29

30

31

32

33

34

35

Equip or

Circuit

ID Num

0

9

10

11

12

13

14

15

16

17

18

Description

(Example)

Lucent PBX cabinet

Lucent PBX cabinet

Lucent PBX cabinet

Lucent EPN cabinet

Lucent EPN cabinet

Lucent EPN cabinet

Southwestern Bell

Data Cabinet 1, plug strip 1

Cisco Switch (both Strips in this cabinet)

Data Cabinet 1, plug strip 2

Data Cabinet 2, plug strip 1

Xylan Omniswitch

Data Cabinet 2, plug strip 2

Xylan Omniswitch

Data Cabinet 3, plug strip 1

Fiber Racks (for Xylan)

Data Cabinet 3, plug strip 2

Fiber Racks (for Xylan)

Data Cabinet 4, plug strip 1

Data Cabinet 4, plug strip 2

Equipment Cabinet, plug strip 1

AUDIX

AUDIX-monitor

Equipment Cabinet, plug strip 2

Desk/Cubicle Area

Dictaphone Mgmt Equipment

Lucent Switch Monitoring Eq.

CAS- monitor

Dictaphone Cabinet

928-5 general use plug strip 1

928-5 general use plug strip 2

928-5 general use plug strip 3

928-5 general use plug strip 4

928-5 general use plug strip 5

928-5 general use plug strip 6

928-5 general use plug strip 7

928-5 general use plug strip 8

928-5 general use plug strip 9

928-5 general use plug strip 10

928-Bsmt telco rm, outlet 1 - duplex

928-Bsmt telco rm, outlet 2 - duplex

928-Bsmt telco rm, outlet 3 - quad

928-Bsmt telco rm, outlet 4 - quad

928-Bsmt telco rm, outlet 5 - quad

928-Bsmt telco rm, plug strip 1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Circuit

Box ID

( no t e 1)

1

1

1

1

Volts Amps

120 6

208 VAC

208 VAC

208 VAC

120 VAC

120 VAC

120 VAC

110

110

100

110

110

17.5

17.5

17.5

6

6

6

20

20

6A

20

20

100V/115V/230V 8.0/8.0/4.0

110 20

100V/115V/230V 8.0/8.0/4.0

110 20

KvA

( no t e 2 )

0.72

Phase

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

# Circuit Bkrs,

Ampacity, Poles

( no t e 2 )

2 - 15A, 1P

1 110 20 1

1

1

1

1

1

110

110

110

110

110

110

110

110

110

120

110

1

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

12

20

20

1

1

1

1

1

1

Then we needed to include electrical requirements for all equipment

Floor Plan Development 4-27

We added the electrical requirements for the equipment.

Floor Plan Development 5-31

Our final deliverable for the General Equipment layout of the 928 - 5th floor.

Cable Tray Development 4-23

We needed paths for the 300 pair cables to run, as well as the fiber cables.

Cable Tray Development 5-31

The final cable tray layout for the 928 - 5th floor room.

Ladder Tray Layout

Voice Wall Field

The first of the north wall Krone block, voice blocks

ELL Wall Field

The first of the north wall Krone block,

ELL blocks

Wall Field 4-17

Wall plans developed

Wall Field 5-08

Wall plans developed some more

Wall Field 6-07

Final North Wall field layout for RFP

Telco Closet 5-08

Typical Telco Closet 6-07

4th Floor Telco Closet 6-07

5th Floor Telco Closet 6-07

Fiber Runs 4-26

Electric Circuit Runs 6-04

Responsibilities & Learning

Contracts

Jeremiah - Client Liaison

Darryl - Researched Equipment

Russell - Microsoft Project ‘98 File

DJ - FTP Server & Team Workshop

Todd – Team Manager & Visio

Drawings

Thank you

Jeff Bowman

Cecil Lampkins

Diane Ooton

Download