By: Russell Schrotberger
Todd Pavlik
Jeremiah Irish
DJ Waring
Darryl Bartshe
The specific deliverables that we request of the DeVry team are as follows:
• 1.Design all aspects of the central Telco room that will serve 18 floors of the 928 building and 6 floors of the 910 building.
– A. Create a layout for Voice equipment (Lucent PBX expansion cabinets, SWBT cabinets, SWBT Dmark location, etc.)
– B. Create a layout for Data equipment (data cabinets, server locations, Xylan location, etc.)
– C. Create a layout for all other equipment (air conditioners, overhead lighting placement, cable routes, ladder tray placement, etc.)
– D. Calculate worker populations per floor to determine phone capacity and to determine the size requirements of the PBX expansion cabinets.
• 2.Research and make recommendations in a variety of areas including electrical requirements, RFP documentation, equipment inventories,
Voice and Data needs, etc.
• 3.Contact vendors regarding wiring installation and other equipment needs.
• 4.Ensuring that the central Telco room has capacity for a fast growing environment.
The project original objective was to help UMB in the planning phase of a switch room design as well as a departmental move for UMB Bank.
Scope change within the project: Employee Benefits move will not take place until May/June of 2001.
Tasks completed for UMB were to help design a main switch room for 928 building, help in research of products, create drawings of the main switch room layout and other components with Visio, gather specifications for equipment, etc.
Finalized Floor Plan Layout’s – Drawn in Visio – note: this will included the Voice and Data capacity requirements
Project Management File for the move of the EB
Department – in MS Project ’98
Documentation of location of all terminated cable runs in Visio
Finalized Electrical Requirements for the switch room in MS Excel format
An RFP to be presented to whomever will be contracted to do the installation
Planning of new Telco Room
Determine number of workstations/users
Determine the standard equipment that we were going to use
Provide Electrical requirements for all equipment
Create a layout of all equipment in main telco room as well as satellite closets
Devise a naming convention.
Floor Plan Development
First we created a template for our room
Floor Plan Development 4-16
Next, we began inserting objects into the room.
3
4
5
6
1
2
7
8
24
25
26
27
28
19
20
21
22
23
29
30
31
32
33
34
35
Equip or
Circuit
ID Num
0
9
10
11
12
13
14
15
16
17
18
Description
(Example)
Lucent PBX cabinet
Lucent PBX cabinet
Lucent PBX cabinet
Lucent EPN cabinet
Lucent EPN cabinet
Lucent EPN cabinet
Southwestern Bell
Data Cabinet 1, plug strip 1
Cisco Switch (both Strips in this cabinet)
Data Cabinet 1, plug strip 2
Data Cabinet 2, plug strip 1
Xylan Omniswitch
Data Cabinet 2, plug strip 2
Xylan Omniswitch
Data Cabinet 3, plug strip 1
Fiber Racks (for Xylan)
Data Cabinet 3, plug strip 2
Fiber Racks (for Xylan)
Data Cabinet 4, plug strip 1
Data Cabinet 4, plug strip 2
Equipment Cabinet, plug strip 1
AUDIX
AUDIX-monitor
Equipment Cabinet, plug strip 2
Desk/Cubicle Area
Dictaphone Mgmt Equipment
Lucent Switch Monitoring Eq.
CAS- monitor
Dictaphone Cabinet
928-5 general use plug strip 1
928-5 general use plug strip 2
928-5 general use plug strip 3
928-5 general use plug strip 4
928-5 general use plug strip 5
928-5 general use plug strip 6
928-5 general use plug strip 7
928-5 general use plug strip 8
928-5 general use plug strip 9
928-5 general use plug strip 10
928-Bsmt telco rm, outlet 1 - duplex
928-Bsmt telco rm, outlet 2 - duplex
928-Bsmt telco rm, outlet 3 - quad
928-Bsmt telco rm, outlet 4 - quad
928-Bsmt telco rm, outlet 5 - quad
928-Bsmt telco rm, plug strip 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Circuit
Box ID
( no t e 1)
1
1
1
1
Volts Amps
120 6
208 VAC
208 VAC
208 VAC
120 VAC
120 VAC
120 VAC
110
110
100
110
110
17.5
17.5
17.5
6
6
6
20
20
6A
20
20
100V/115V/230V 8.0/8.0/4.0
110 20
100V/115V/230V 8.0/8.0/4.0
110 20
KvA
( no t e 2 )
0.72
Phase
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
# Circuit Bkrs,
Ampacity, Poles
( no t e 2 )
2 - 15A, 1P
1 110 20 1
1
1
1
1
1
110
110
110
110
110
110
110
110
110
120
110
1
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
12
20
20
1
1
1
1
1
1
Then we needed to include electrical requirements for all equipment
Floor Plan Development 4-27
We added the electrical requirements for the equipment.
Floor Plan Development 5-31
Our final deliverable for the General Equipment layout of the 928 - 5th floor.
Cable Tray Development 4-23
We needed paths for the 300 pair cables to run, as well as the fiber cables.
Cable Tray Development 5-31
The final cable tray layout for the 928 - 5th floor room.
Ladder Tray Layout
Voice Wall Field
The first of the north wall Krone block, voice blocks
ELL Wall Field
The first of the north wall Krone block,
ELL blocks
Wall Field 4-17
Wall plans developed
Wall Field 5-08
Wall plans developed some more
Wall Field 6-07
Final North Wall field layout for RFP
Telco Closet 5-08
Typical Telco Closet 6-07
4th Floor Telco Closet 6-07
5th Floor Telco Closet 6-07
Fiber Runs 4-26
Electric Circuit Runs 6-04