Communications Room Checklist

advertisement
BEAP Site:
Inspection Date:
/
/
Communications Room Checklist
Preliminary Details
Building Number
Room Number
DEMS number
ROMAN number
Location / Coordinates
Photos start at No.
Security Rating Checklist
Highest classification cabling / network equipment in
room
Security rating requirement
Intruder Resistant Area Checklist
Walls extend from base of
floor to underside of slab
or secured roof structure?

Yes

No
If No, is an additional
barrier installed which
reaches the underside of
slab or secured roof
structure?

Yes

No

UNCLAS

RESTRICTED

SECRET

Intruder Resistant

Secure Area
Secure Area Checklist
Is the space wholly located
within the perimeter of a
building which meets
Intruder Resistant
requirements? (attach
assessment sheet)

Yes

No
Walls extend from base of
floor to underside of slab
or secured roof structure?

Yes

No
If No, is an additional
barrier installed which
reaches the underside of
slab or secured roof
structure?

Yes

No
Base Engineering Assessment Program Checklist Template
533563518
Page 1 of 9
BEAP Site:
Inspection Date:
Intruder Resistant Area Checklist
What type of additional
barrier is installed?



Wall construction
Roof construction
Are windows or glazing
installed in walls?
If yes, is the glazing
secured to the frame in a
tamper evident fashion?
Are blinds or drapes
installed over glazed
areas?
What level of the building
is the room in?
Stud/plasterboard
/
/
Secure Area Checklist
What type of additional
barrier is installed?
Mesh, installed to
security standard


Other (specify)
Other (specify)

Concrete
Brickwork
Concrete

Brickwork


Stud/Plasterboard


Other (specify)

Concrete

Sheet metal

Other (specify)

Yes

No

Yes

No

Yes

No
Mesh, installed to
security standard


Wall construction
Stud / plasterboard /
plywood

Stud / plasterboard /
plywood
Stud / plasterboard /
steel plate

Other (specify)
If the wall construction is
stud/plasterboard/plywood,
is the plywood on the
external wall face?

Yes

No

Unable to check
Are joins in plywood at
studs / noggins only?

Yes

No

Unable to check

Yes

No

Unable to check

Concrete

Sheet metal

Other (specify)

Yes

No

Unable to check
Do joins in plasterboard
line up with joins in
plywood?
Roof construction
If the roof construction is
concrete, is the slab
thickness >100mm with
F82 wire mesh
reinforcement?
Base Engineering Assessment Program Checklist Template
533563518
Page 2 of 9
BEAP Site:
Inspection Date:
Intruder Resistant Area Checklist
Is there additional
protection installed to
glazing?

Yes (specify)

No
How many doors are
there to the space?

Yes

No
Are all doors constructed
from flush panel, block
timber and have a solid
core?

Yes

No
Do all doors (excluding
fire exits) have a double
cylinder mortice lock?

Yes

No
Do all fire exit doors have
either a double cylinder
mortice lock or external
cylinder and internal
manual turn knob?

Yes

No
Are deadbolts installed to
all doors?

Yes

No
Are door hinges internal
to the space and have
security hinge bolts and
lock bolts protectors
fitted?

Yes

No
Are door closers fitted to
all doors?

Yes

No

Yes

No

N/A
Are all door thicknesses
>38mm?
If double doors are
installed, is the inactive
leaf secured with
flushbolts or locking
padbolts?
/
/
Secure Area Checklist
If the roof construction is
sheet metal or other, is
F82 welded wire mesh
installed on the roof as per
the security standard?

Yes

No
Are windows or glazing
installed in walls?

Yes

No
If yes, is the glazing
secured to the frame in a
tamper evident fashion?

Yes

No
Are blinds or drapes
installed over glazed
areas?

Yes

No

Yes (specify)

No

Yes

No
Are all doors constructed
from flush panel, block
timber and have a solid
core?

Yes

No
Do all doors (excluding fire
exits) have a double
cylinder mortice lock?

Yes

No
What level of the building
is the room in?
Is there additional
protection installed to
glazing?
How many doors are there
to the space?
Are all door thicknesses
>45mm?
Base Engineering Assessment Program Checklist Template
533563518
Page 3 of 9
BEAP Site:
Inspection Date:
Intruder Resistant Area Checklist
Does the locking scheme
comply with egress
requirements of the BCA?

Yes

Are there any
penetrations over 280mm
diameter or 280mm side
length into the space?
If yes, are security grilles
fitted to the applicable
penetrations?
/
/
Secure Area Checklist

Yes
No
Do all fire exit doors have
either a double cylinder
mortice lock or external
cylinder and internal
manual turn knob?

No

Yes

Yes

Are deadbolts installed to
all doors?
No

No

Yes

Yes

No
Are door hinges internal to
the space and have
security hinge bolts and
lock bolts protectors fitted?

No
Are there at least 3 hinges
per door?

Yes

No
Are the door frames made
or cold formed steel with
minimum thickness
1.6mm?

Yes

No
Are door closers fitted to
all doors?

Yes

No
If double doors are
installed, is the inactive
leaf secured with
flushbolts or locking
padbolts?

Yes

No

N/A
If locking padbolts are
installed, do they have
SCEC endorsed locking
cylinders?

Yes

No
Does the locking scheme
comply with egress
requirements of the BCA?

Yes

No
Are there any penetrations
over 150mm diameter or
150mm side length into
the space?

Yes

No
If yes, are security grilles
fitted to the applicable
penetrations?

Yes

No
Base Engineering Assessment Program Checklist Template
533563518
Page 4 of 9
BEAP Site:
Inspection Date:
Intruder Resistant Area Checklist
/
/
Secure Area Checklist
Additional Notes
Sketch of Room
Include internal dimensions, racks, rack dimensions, frames, entrances, penetrations and any other relevant
details
Base Engineering Assessment Program Checklist Template
533563518
Page 5 of 9
BEAP Site:
Inspection Date:
/
/
Room Checklist
Room internal dimensions (mm)
Length (mm):
Width (mm):
Is there at least 900mm clear space at the front and
rear of all racks?
Internal dimensions

Yes

No
Length (mm):
Width (mm):
Does the room have anti-static flooring installed as per
AS 2834?
Is there a building Entrance Facility within the room?
If yes, where do conduits turn up?

Yes

No

Yes

No

Within rack

Within room

Through wall

Other (specify)

Yes

No

Conduit

Basket

Tray

Ladder

Other (specify)

Yes

No
How many conduits enter the room?
What % spare capacity is there within the entrance
facility conduits?
Is the lead-in cabling correctly secured to a tray,
basket, ladder or conduit?
What type of cable containment exists to/from racks?
What % spare capacity is there in the most full cable
containment?
Is all cable containment readily accessible (i.e. access
to lay in trays, conduits have draw wire installed)?
Base Engineering Assessment Program Checklist Template
533563518
Page 6 of 9
BEAP Site:
Inspection Date:
Are cables protected from sharp edges at all times?
What condition is the cabling within the room in?
Are cable bending radii observed for all cables within
the room?
Are appropriate separation distances maintained
between power and communications cables?
Are appropriate separation distances maintained
between cables of different security classification?
Are all cable sheath colours as per the ISM?
Is all labelling installed within the room as per the
DCCS?
Is there 24/7 air conditioning installed to the room?
/
/

Yes

No

Good

Fair

Poor

Other / mixture (specify)

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No
If yes, what is the capacity of the air conditioning
unit(s), in kW?
If the air conditioning unit(s) is labelled, what is the
designation of the unit?
Is there a distribution board installed within the room?
What is the label on the distribution board serving the
room?
Base Engineering Assessment Program Checklist Template
533563518
Page 7 of 9
BEAP Site:
Inspection Date:
/
/
How many spare ways are there in the distribution
board serving the room?

Yes

No

Yes

No
Is there an individual earth cable installed from each
rack to either a CES link bar or to the earth bar of the
nearest distribution board?

Yes

No
If the racks are powdercoated, has the connection point
of the earth cable been stripped back to bare metal?

Yes

No

Smoke detectors

VESDA

None

Other (specify)

Sprinklers

Other (specify)

Yes

No
Does each rack have at least 2x20A captive single
phase outlets?
Is there a Communications Earthing System link bar
installed within the room?
What type of fire detection is installed in the room?
What type of fire suppression is installed in the room?
Are all penetrations to the room firestopped?
What method of firestopping is used?
Specify:
How many racks are there in the room?
What are the attached rack checklist numbers?
How many telephone frames are there in the room?
What are the attached telephone frame checklist
numbers?
Base Engineering Assessment Program Checklist Template
533563518
Page 8 of 9
BEAP Site:
Inspection Date:
/
/
Additional Notes
Provide a description of any floor standing equipment not covered above, along with any additional observations.
Base Engineering Assessment Program Checklist Template
533563518
Page 9 of 9
Download