Dummy 1 PROPOSED ICDS-IV/REFORM PROJECT PROJECT ACTIVITY-COST ITEM DATA SHEET Activity # : 60 (from sl.no in Table 1) Activity : Construction of Model AWCs in needy areas Activity Site : AWC Implementing Agency : J.Engineer (PWD)/PRI Head/Supervisor Project Component : Infrastructure Development Expenditure Category : Civil Works (Investment Cost) Scope of Work : Construction of a total of 300 Model AWCs in identified needy areas (a) Year 1 Construction of 100 AWCs in the 1st Year @ Rs. 2 Lakh per AWC = 100 x 2.00 = Rs. 200.00 Lakh (b) Year 2 Construction of 200 AWCs in the 2nd year @ Rs. 2 Lakh per AWC = 200 x 2.00 = Rs. 400.00 Lakh Estimated Cost : Rs. 600.00 lakh Site Considerations : As decided by SPMU/District Cell Specification Method : As per design specified by SPMU Procurement Method : To be decided by SPMU Implementation Estimates : (Rs. lakh ) 2009-10 200.00 2010-11 400.00 2011-12 --- 2012-13 --- 2013-14 -- Dummy 2 PROPOSED ICDS-IV/REFORM PROJECT PROJECT ACTIVITY-COST ITEM DATA SHEET Activity # : 50 (from sl.no in Table 1) Activity : Capacity Building on thematic areas e.g., nutritional practices, ECE, counseling /behavior change communication etc. for AWW, Supervisors, CDPOs, CBOs etc. Activity Site : District level Responsible Agency : SPMU/District Cell Project Component : Training/capacity building Expenditure Category : Investment cost Scope of Work : (i) At District level: Capacity building of CDPOs: @ Rs. 3000/training; 2 training programs (2 days)/year for 4½ years = 2 x 3000 X 4.5 X 10 (# districts) = Rs. 2.70 lakh (ii) At Block level: Capacity Building of Supervisors: @ Rs. 1500/training; 2 training program/year for 4½ years = 2 X 1500 X 4.5 X 200 (blocks) = Rs. 27.00 lakh (iii) At Sector level: (a) Capacity building of AWWs: @Rs.3750/training; 2 programs/year for 4½ years [2 day programme for 25 AWWs. 2 programmes/year @ Rs.3750/training @ Rs. 150 per AWWs] = 2 X 3750 X 4.5 X 800 (sectors) = Rs. 270.00 lakh (b) Capacity building of CBOs (2 persons/AWC from SHGs/Mahila Mandals): @ Rs.7500/training; 2 programs/year for 4½ years.[2 day programme for members of CBOs (2 persons per AWC) at sector level (total 50 persons) @ Rs. 150 per person] = 2 X 7500 X 4.5 X 800 (sectors] = Rs.540.00 lakh Total = (i) + (ii) + (iii) = Rs.839.70 lakh Estimated Cost : Rs. 839.70 lakh Site Considerations : NA Specification Method : NA Procurement Method : NA Implementation Estimates 2009-10 83.97 : 2010-11 251.91 2011-12 167.94 2012-13 167.94 (Rs. lakh ) 2013-14 167.94