Uploaded by rho_lambda

Structural Plan: AM Transmitter Station Project

advertisement
8150
GENERAL NOTES
FTB-1
625.00
0.15 MTS. THK. CHB
101.64
17.3 MPa (2,500 psi)
0.125 MTS.
THK. CHB
0.15x0.25 MTS.
CONCRETE COLUMN
0.15x0.25 MTS.
CONCRETE COLUMN
CONTINUOUSLY
DOWEL BARS
(ALTERNATELY
INSTALLED)
4150
INTERSECTION DOWEL BARS
(ALTERNATELY INSTALLED)
5 layer 6" Load-bearing CHB
SEPTIC TANK
INTERSECTION WALL
MH
(detachable
concrete)
FTB-1
F1/C1
FTB-1
F1/C2
CONTINUOUS WALL
NAT. GROUND LINE
MASONRY DETAIL
F1/C1
FOUNDATION PLAN
UNLESS OTHERWISE INDICATED IN PLANS OR NOTED IN THE SPECIFICATIONS THE MINIMUM 28-DAY
CYLINDER COMPRESSIVE STRENGTH OF CONCRETE, f'c, SHALL BE AS FOLLOWS
2. SLABS ON GRADE
3125
12MM THK. EXPANSION
JOINT W/ MORTAR FILLER
12MM THK. EXPANSION JOINT
W/ MORTAR FILLER
0.15 MTS. THK. CHB
ALL SLABS, BEAMS, GIRDERS, AND OTHER STRUCTURAL ELEMENTS WHICH ARE NOT INDICATED,
DETAILED, DESIGNATED OR INADVERTENTLY OMITTED BUT ARE NECESSARY TO BE COORDINATED
WITH ARCHITECTURAL AND OTHER ALLIED ENGINEERING PLANS AS WELL AS TO COMPLETE THE
STRUCTURAL WORKS IN ACCORDANCE WITH THE INTENT OF THE PLANS AND SPECIFICATIONS SHALL
BE BROUGHT UP DURING PRE-BIDS / MEETINGS / NEGOTIATIONS. IT IS UNDERSTOOD THAT THE
CONTRACTOR HAS PROVIDED AND INCLUDED ALL THESE ITEMS IN HIS BID.
24.0 MPa (3,500 psi)
10mm Ø LAT. TIES
SPACED 1 @
50mm, 4 @ 100mm,
& REST @ 200mm
O.C.
FTB-1
ALL STRUCTURAL STEEL WORK SHALL BE DONE IN ACCORDANCE WITH THE NSCP VOL. 1, 1992 EDITION,
CHAPTER 4 AND THE AISC ASD 1989 IN SO FAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING
CODE REQUIREMENTS.
1. COLUMNS, BEAMS, GIRDERS, AND SUSPENDED SLABS
CONCRETE WALLS, BORED PILES, AND PILE CAPS
101.64
2075
ALL REINFORCED CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL
STRUCTURAL CODE OF THE PHILIPPINES (NSCP) VOL. 1, 1992 EDITION, CHAPTER 5, AND THE ACI 318-95
BUILDING CODE.
NOTES ON CONCRETE MIXES AND PLACING
A.
F1/C2
2075
D.
FTB-1
2125
C.
F1/C2
FTB-1
B.
F1/C1
IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN AND
DISTANCES OR SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
FTB-1
A.
6050
2100
COMPACTED GRAVEL BEDDING
5 - 12mmØ MAT
BARS SPACED AS
SHOWN O.C. B.W.
8150
6050
2100
B-1
B-1
4 - 16mmØ RSB
4150
B-1
CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION, RE-HANDLING OR
FLOWING. PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR WHEEL BARROWS. NO
CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUGGIES, WHEEL
BORROWS OR BUCKETS, IN WHICH CASE, THEY SHALL NOT EXCEED SIX (6) METERS IN AGGREGATE
LENGTH.
2075
MPa (1,000 psi)
B-1
B.
7
B-1
3. LEAN CONCRETE
TYPICAL COLUMN AND FOOTING DETAIL
NOT TO SCALE
2075
B-1
NOTES ON FOUNDATION
A.
100mm-THK conc. slab
10mm-dia. @200mm
O.C. both ways
FOOTINGS WERE DESIGNED WITH AN ASSUMED ALLOWABLE SOIL BEARING PRESURE 100 KPa.
CONTRACTOR SHALL REPORT IN WRITING TO THE STRUCTURAL ENGINEER ACTUAL SOIL CONDITION
UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE.
B.
NO FOOTING SHALL REST ON UNCOMPACTED FILL, PROVIDE WELL COMPACTED GRAVEL BEDDING.
C.
MINIMUM CONCRETE PROCTECTION FOR REINFORCMENT SHALL BE 75mm CLEAR FOR CONCRETE
DEPOSITED AGAINST THE GROUND AND 40mm FOR CONCRETE DEPOSITED AGAINST FORMWORK.
D.
PROVIDE TEMPORARY REMOVAL OF WATER FORM ANY SOURCE DURING CONSTRUCTION.
DEWATERING SHALL BE CAREFULLY AND PROPERLY PERFORMED TO AVOID DISTURBING THE
FOUNDATIONS AND SLAB BEARING SURFACES.
FOOTING DETAIL
B-1
B-1
TOP SLAB PLAN
C-1
DIMENSION
REBARS
SPACING
DIMENSION
REBARS
SPACING
w
500
500
4075
4075
l
COLUMN
E.
IN CASES WHERE REQUIRED FOOTING LEVELS SHOW A HONEYCOMBED STRUCTURE CONTAINING
LOOSE MATERIALS, REMOVE LOOSE MATERIALS AND FILL ALL VOIDS WITH 10 MPa (1500 Psi) LEAN
CONCRETE, USE A VIBRATOR TO ASSURE WELL COMPACTED CONCRETE IN ALL VOID PORTIONS.
C-2
B.
C.
5150
T-1
l
WHEN A BEAM CROSSES A GIRDER, REST BEAM BARS ON TOP OF GIRDER BARS, REINFORCING
BARS SHALL BE SYMMETRICAL ABOUT THE CENTER LINE WHERE EVER POSSIBLE AND UPPER BARS
SHALL BE PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.
COLUMN
LONGITUDINAL REINFORCEMENT OF GIRDERS, BOTH TOP AND BOTTOM, TERMINATED IN A COLUMN
SHALL BE EXTENDED TO THE FAR FACE OF THE CONFINED CONCRETE CORE OF THE COLUMN AND
TERMINATED BY A STANDARD 90° HOOK. SEE DETAILS OF STANDARD HOOKS.
BEAM ID
PROVIDE HOOP REINFORCEMENT SPACED AT 100mm O.C. OVER THE LENGTH OF LAPPED BARS.
FTB-1
BEAM DETAILS
0.25
2-16mm Ø TOP BAR
135 HOOK 6db 75mm MIN. ROTATED (TYP.)
10mm Ø STIRRUPS 2 @ 50mm. 4 @ 100mm REST @
200mm O.C.
0.35
A.
T-1
NOTES ON BEAMS AND GIRDERS
T-1
w
4-16mm Ø BOTTOM BARS
40mm CONCRETE COVER
B.
ALL SLABS REINFORCEMENTS SHALL HAVE A CLEAR DISTANCE OF 20mm FROM THE BOTTOM AND
FROM THE TOP OF SLABS.
IF SLABS ARE REINFORCED BOTHWAYS, BARS ALONG THE SHORTER SPAN SHALL BE PLACED
BELOW THOSE ALONG THE SPAN AT THE CENTER AND OVER THE LONGER SPAN BARS NEAR THE
SUPPORTS.
1500
TC
BC
DIAGONALS
PURLIN
SAGROD
:
:
:
:
:
Mobile:
Viber:
E-mail:
+63 930 8716547
+63 975 7741224
ironline.constructionservices@gmail.com
2100
B-1
5150
DESCRIPTION
DATE
INITIALS SIGNATURE
2-16mm Ø TOP BAR
135 HOOK 6db 75mm MIN. ROTATED (TYP.)
10mm Ø STIRRUPS 2 @ 50mm. 4 @ 100mm REST @
200mm O.C.
2-16mm Ø BOTTOM BARS
40mm CONCRETE COVER
ROOF FRAMING PLAN
REV. NO.
ENGINEER:
1500
2L 2"X2"X3MM THK
2L 2"X2"X3MM THK
L 1"X1"X3MM THK
TUBE 1"X1"X2MM spaced @ 600mm O.C.
10mm-dia. REBAR
STRUCTURAL NOTES AND SPECIFICATIONS
IRONLINE
CONSTRUCTION SERVICES
0.20
0.30
A.
900
NOTES ON CONCRETE SLABS
SCHEDULE OF COLUMN AND BEAM
DATE
PROJECT OWNER
CONTRACTOR
PROJECT
PRAGE
Management Corp.
Ironline Construction
Services
AM TRANSMITTER
STATION PROJECT
DRAWN BY:
________________
PRC NO:
PTR NO:
TIN NO:
DATE ISSUED:
DATE ISSUED:
ISSUED AT:
DESIGNED BY:
CHECKED BY:
APPROVED BY:
Brgy. Tibagan, Bustos, Bulacan
SHEET CONTENT
SHEET:
S
1| 1
Download