Uploaded by alnoel tordilla

3.4 6000psi.rev1

advertisement
CONCRETE SLUMP RETENTION
PROJECT:
DATE:
SIZE OF AGG.
DESIGN:
TRIAL BATCH NO.:
INITIAL SETTINGS:
FINAL SETTINGS:
AVENIDA TOWERS AND COMMERCIAL CENTER
3/4"
F 6000psi @ 28 days (4hrs-workability)
TM-3
Temperature of
Concrete
Conducted by:
(signature over printed name)
TIME
SLUMP
Witnessed by:
(signature over printed name)
REMARKS
Noted by:
(signature over printed name)
Download