CONCRETE SLUMP RETENTION PROJECT: DATE: SIZE OF AGG. DESIGN: TRIAL BATCH NO.: INITIAL SETTINGS: FINAL SETTINGS: AVENIDA TOWERS AND COMMERCIAL CENTER 3/4" F 6000psi @ 28 days (4hrs-workability) TM-3 Temperature of Concrete Conducted by: (signature over printed name) TIME SLUMP Witnessed by: (signature over printed name) REMARKS Noted by: (signature over printed name)