Mission
Serve Army and DOD
Planning/Design/Construction
Airfields/Railroads/Roadways
BUILDING STRONG®
TSC Services
Design Reviews
Technical Consulting
Criteria Update
PCASE (Computer Software)
A-E IDT Contracts
Training
BUILDING STRONG®
Airfield Design Policy
(HQUSACE Policy Nov 02)
https://transportation.wes.army.mil/tsmcx/downloads/revpolcy.pdf
TSC review all Corps designed
►Airfield
►Road
and railroad projects
projects > $3M
BUILDING STRONG®
Airfield Design Policy
(AR 95-2 dated 10 Apr 07)
http://armypubs.army.mil/epubs/95_series_collection_1.html
TSC review all:
►AAF/AHP
project designs
►AAF/AHP
waivers
►AAF/AHP
airfield evaluations/surveys
BUILDING STRONG®
HQ AMC Design Policy
(HQ AMC Policy dated Feb 02)
https://transportation.wes.army.mil/tsmcx/downloads/amcpolcy.pdf
TSC review all AMC airfield
projects (including airfield
lighting and NAVAIDS) over $1M
HQ AMC has 12 major bases
BUILDING STRONG®
Mandatory Requirements
(ECB 2011-18 dated 26 Sep 11)
All airfield project designers for USACE
airfield projects are strictly prohibited
from editing or rewriting unbracketed text
of UFGS 32 13 11 and UFGS 32 12 15
without specific prior approval from TSC
BUILDING STRONG®
FY05-12 Design
Reviews
1200
1000
Total
800
600
400
FY12
FY11
FY10
FY09
FY08
FY07
FY06
0
FY05
200
BUILDING STRONG®
Phase 2
02-06
Major
Design
Review
Phase 3
05-09
Phase 1
97-04
Runway Relocation
Penny
Lake
• 1997 – 2009 ($3B)
• 1000 m Seaward
• Reclaim 531 Acres (+33%)
BUILDING STRONG
• MCAS Iwakuni, Japan
®
North and South Runways
Andersen AFB, Guam
BUILDING STRONG®
Osan AB, Korea 9000' Second Runway
(Runway also designed as a levee)
Full ALSF
(Both Ends)
Patriot Facility
Concrete Runway &
Touchdown Zones
Potential ROK
VORTAC
Potential ASR Site
Clear Zone
Clear Zone
Lateral Clear Zone
9000' Runway
1000’
Overrun
Holding Apron
MAAS
1000’
Overrun
MAAS
Existing GS
Hot Cargo Pad
Existing ATCT
Proposed PAPI
(Both Ends)
Proposed Elec
Vault Location
•Basic 9000’ Concrete Runway
Basic 9000’ Runway Includes:
•Hot Cargo Pad
•8000’ Runway w/ PCC Touchdown zones
•Holding Apron
•1000’ Paved Overruns
•Full Patriot Facility
•1300’(West)/1200’(East) ALSF-1 & REILs
•Full ALSF
•BAK-12 & E-5 Barriers
Holding Apron
Existing GS
•2 MAAS
•1 Lane Asphalt Perimeter Road
•New Runway Lighting Vault
•Basic Patriot Facility
BUILDING STRONG®
Main Base Runway/Temporary Runway
Edwards AFB, CA
($100M)
BUILDING STRONG®
Technical Consulting
(Planning and Design)
Airfield Suitability Studies
Planning Charrettes
Review meetings
A-E selection panels
VE Study teams
BUILDING STRONG®
Technical Consulting
(Construction)
Batch Plant Inspection
Uniformity Testing
Inspection of test section
Inspection of mainline paving
Construction troubleshooting
BUILDING STRONG®
Technical Consulting
One-Stop Service
On-Site, Telephonic, E-mail
SIPRNET/Secure VTC
Planning/Design/Construction
BUILDING STRONG®
Mandatory Requirements
(ECB 2011-17 dated 26 Sep 11)
TSC review all airfield pavement PCC
mix designs and HMA job mix formulas
for USACE managed airfield pavement
projects: funded by district S&A
Already do for Air Force managed airfield
projects via central funding
BUILDING STRONG®
Airfield Construction Policy
(ECB 2009-22 dated 10 Sep 2009)
http://www.wbdg.org/ccb/ARMYCOE/COEECB/ARCHIVES/ecb_2009_22.pdf
All airfield projects exceeding $10M are
required to obtain additional technical
support from TSC (2 persons/2 weeks)
during initial phases of construction
Includes evaluation of test sections,
verification of plant calibration and on-site
evaluation of paving operations
BUILDING STRONG®
Airfield Construction Policy
(ECB 2011-17 dated 26 Sep 2011)
http://www.wbdg.org/ccb/ARMYCOE/COEECB/ecb_2011_17.pdf
TSC review all airfield pavement
PCC mix designs and HMA job mix
formulas for USACE managed
airfield pavement projects: funded by
district S&A
Already do for Air Force managed
airfield projects via central funding
BUILDING STRONG®
Criteria Update
Unified Facilities Criteria (UFC)
Guide Specifications (UFGS)
NATO/ASCC
Develop/Update/Review
BUILDING STRONG®
Criteria Update
34 UFCs
66 UFGSs
12 NATO STANAGS
34 ASCC Air Standards
BUILDING STRONG®
Criteria Update
ETL 1110-3-506 Aviation Complex
Planning and Design Criteria for Army
Unmanned Aircraft Systems (UAS)
dated 1 Mar 2011
Final review for new Army, Air Force
and Navy UAS ETL
BUILDING STRONG®
Software for the design and
evaluation of airfields and roads
PCASE Desktop
NEW official version – PCASE2.09.02 (Feb 2012)
NEW PCASE2.09 User Manual (available on website)
PCASE Website
www.pcase.com
https://transportation.wes.army.mil/pcase
PCASE Workshops (2 days)
• USACE, Kansas City District, Missouri – 20-21 Jun 2012
PCASE-PAVER Workshops (4 days)
• Air Force, Aviano Air Base, Italy – 16-20 Jul 2012
A-E IDIQ Contracts
Airfields/Railroads/Roads
Available to all Districts
To customers via Districts
Airfield obstruction chart (AOC) surveys
New contract for Petrographic/Specialized
Concrete Testing
BUILDING STRONG®
A-E IDIQ Contracts
(Airfield Obstruction Surveys)
CH2MHill (Jan 2015)
Midlands Surveying (Jun 2014)
BUILDING STRONG®
A-E IDIQ Contracts
(Airfield Design/Evaluation)
Stanley-Hanson JV (Nov 2015)
Pond & Co. (Dec 2015)
Tigerbrain (Sep 2015)
Dorsey & Dorsey (Jul 2015)
BUILDING STRONG®
A-E IDIQ Contracts
(Railroad/Roadway Design/Evaluation)
HDR (Jul 2015)
Hanson (Aug 2015)
BUILDING STRONG®
A-E IDIQ Contracts
(PAVER/Design Reviews)
All About Pavements, Inc (May
2012)
BUILDING STRONG®
A-E IDIQ Contracts
(Petrography and Specialized Concrete
Testing)
New contract
Tentatively, 1 large and 2 small
businesses
Working on scope of work
BUILDING STRONG®
Training
PCASE Workshops (2 – 6)
TS2012 Workshop (every 4 yrs)
Airfield Paving Workshops (10 – 20)
Airfield Lighting Workshops (1 – 2)
Airfield Design Workshops (1 – 2)
BUILDING STRONG®
• 418 attendees: USACE (89), Air Force (89),
Army (5), Navy (24), Marine Corps (4), FAA
(7), Academia (28), A-Es, contractors, and
industry (193), DOT and other Govt (10)
• 48 exhibitors, 8 seminars, 4 computer labs, 5
poster presentations, 39 sessions
• 155 presenters and 41 moderators
Airfield Construction Policy
(HQUSACE Policy Feb 01)
https://transportation.wes.army.mil/tsmcx/wrkshppolicy.pdf
Conduct on-site Airfield Paving
Workshops for all airfield projects
> $5M
BUILDING STRONG®
PCC Airfield Paving Workshop
Intro/Materials/Mix Design/Plants
Uniformity Testing/Demolition
Slipform and Fixed Form Paving
Dowel Installation/Sawing and Sealing
Control Charts/CQC Testing & Inspection
Acceptance/Review of Specs
BUILDING STRONG®
HMA Airfield Paving Workshop
Mix Design/Plants
Surface Preparation
Laydown/Compaction
QC/QA testing and inspection
Performance Problems
Review of Specs
BUILDING STRONG®
Airfield Lighting Construction
Workshop
Intro/Airfield Lighting Circuit Theory
Grounding/Piping/Drainage Systems
L-823 Connectors (5KV)
Snow Plow Rings/Photometric Testing
Approach Light Systems
FAA Flight Checking
BUILDING STRONG®
Airfield Design Workshop
Overview/Airfield Criteria
Project Data Gathering
Airfield Geometrics/Pavement Marking
Subdrainage/Specs/Design Package
Design Details/Arresting Systems
Airfield Lighting/PCASE
BUILDING STRONG®
TSC Services Worldwide
Central America
El Salvador
Honduras
Europe
Bosnia
Estonia
Greenland
France
Germany
Lithuania
Poland
Iceland
Asia
Romania
Georgia Far East
Serbia
Spain
Japan
UK Mid East
Korea
Afghanistan
Puerto
Bahrain
Rico
Iraq
Africa
Israel
Egypt
Jordan
Tanzania
Kuwait
Pacific
Kyrgyzstan
S. America
East Timor
Oman
Aruba
Kwajalein
Pakistan
Curacao
Palau
Qatar
Columbia
Wake Island
UAE
Ecuador
Guam
Uzbekistan