Feedback Form: Draft LRP II RFQ and Prescribed Forms

Feedback on the draft LRP II RFQ and Prescribed Forms must be sent to engagement@ieso.ca

by July 14, 2016 .

Please identify the section number, definition or appendix of the draft document that you are providing feedback on.

Submitter Information:

Organization: City of Hamilton

Name: Tom Chessman, Manager, Office of Energy Initiatives, Public Works Department

Email:

Section

3.3.2 (a) Mandatory

Requirements (ii)(2)

3.3.2 (a) Mandatory

Requirements (i)(3)

Feedback

Edit – should allow for LCIP ( Large Complex Infrastructure Projects ) experience to be used for Entity and Team experience or explicitly state that this is not a requirement for those with LCIP projects. This LCIP addition should then also be reflected in text of Appendix B or explicitly state that this is not a requirement for those with LCIP projects.

Please Delete – it is not reasonable to mix up Entity experience with Team experience. Alternatively, please allow

LCIP experience to be used or explicitly state that this is not a requirement for those with LCIP projects.

3.3.2 (a) Mandatory

Requirements (ii)(4)

Using external experience requires a ‘sole-source’ arrangement with external engineering firm. This ‘buying’ of

Team experience may not be easy for Applicants that are municipal governments. The public is critical of ‘solesource’ arrangements. City of Hamilton would prefer if Team experience could draw on LCIP projects or if Team experience requirement were to be relaxed, so that City of Hamilton can qualify.

3.3.2 (a) Mandatory

Requirements (i)(6)

3.3.2 (a) Mandatory

Requirements (ii) (1-4)

3.3.2 (b) Financial Capability

(iv) Most Recently

Completed Financial Quarter

(1)

3.3.2 (b) Financial Capability

(iv) Most Recently

Completed Financial Quarter

(1)

App. A – Glossary – LCIP

Please Delete – it is not reasonable to compare delay on a $100 million LCIP to a $10 million LRP project. This requirement discriminates against public sector project (eg. Wastewater) that have political or community issues.

Please add – LCIP experience

Clarify “most recently completed” – it takes up to 60 days to publish financial statements for the preceding

Quarter. If IESO chooses a bid submission date that is within this time window, then the statements for the ‘most recently completed’ Quarter will simply not be available. Alternatively, remove the requirement for Quarterly financial statements entirely and replace with an officer declaration that there has been ‘no material change’ since the issue of the last audited annual financial statements.

Delete “audited” – it is not industry practice to ‘audit’ Quarterly financial statements (Annual only). Question, does

IESO publish ‘audited’ Quarterly statements?

Pres. Template –

Commitment Letter (4.)

Please Edit - LCIP project sizes of $10 million, $100 million or $200 million are too high (this equates 10 times the size of the proposed project). It is suggested that the size LCIP be reduced to 5 times of the proposed project, i.e.,

$5 million, $50 million, $100 million is more reasonable. It is reasonable to show that both the entity and team members have the necessary experience in planning, designing, constructing, and financing projects at this size.

Please clarify “objective condition” – specifically, clarify that ‘subject to approval of LRP Contract by City Council’ is considered an ‘objective condition’ by IESO. The City of Hamilton cannot issue a commitment letter without a council approval clause.

June 27, 2016 1 of 2

120 Adelaide Street West, Suite 1600

Toronto, Ontario M5H 1T1

T 416-967-7474

F 416-967-1947 www.ieso.ca

Feedback Form: Draft LRP II RFQ and Prescribed Forms

Page Two

Organization: City of Hamilton

Name: Tom Chessman, Manager, Office of Energy Initiatives, Public Works Department

Email:

Section

Appendix B Development

Experience: Designated

Team Members (b) Solar

(Rooftop Solar and Non-

Rooftop solar) (ii) (A)

Feedback

Please add – LCIP projects to the experience.

Please replace – 3 Designated Team members with 1 Designated Team member. 3 members with 3 separate projects in 5 different areas of expertise is excessive for a solar project that is 10 MW or less.

Appendix B Development

Experience: Designated

Team Members (e) (ii)

Please add – LCIP projects

June 27, 2016 2 of 2