National Security Agency Overseas Construction Operations Military Construction, Defense-Wide

advertisement
Unclassified
National Security Agency
Overseas Construction Operations
Military Construction, Defense-Wide
FY 2010 Budget Estimates
($ in thousands)
State/Installation/Project
Classified Location
Classified Project
Unspecified Worldwide Locations
Planning and Design
Total
Approp.
Request
New/
Current
Mission
Page
No.
6,000
6,000
N
286
-
600
6,000
6,600
Authorization
Request
289
285
Unclassified
1. COMPONENT
FY 2010 MILITARY CONSTRUCTION PROGRAM
NSA/CSS
DEFENSE
May 2009
3. INSTALLATION AND LOCATION
4. COMMAND
5. AREA
CONSTRUCTION
COST INDEX
NSA/CSS
Classified
6. PERSONNEL STRENGTH
2. DATE
1.41
PERMANENT
OFF
ENL
CIV
STUDENTS
OFF
ENL
CIV
SUPPORTED
OFF
ENL
CIV
a. AS OF 30 SEP 2009
b. END FY 2010
7. INVENTORY DATA ($000)
A. TOTAL ACREAGE
B. INVENTORY TOTAL AS OF 30 SEP 2009
C. AUTHORIZED NOT YET IN INVENTORY
D. AUTHORIZATION REQUESTED IN THIS PROGRAM
E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM
F. PLANNED IN NEXT THREE YEARS
G. REMAINING DEFICIENCY
H. GRAND TOTAL
8. PROJECTS REQUESTED IN THIS PROGRAM:
PROJECT
CATEGORY
PROJECT TITLE
NUMBER
CODE
14113
Classified Project
9. FUTURE PROJECTS:
a. INCLUDED IN FOLLOWING PROGRAM
PROJECT
CATEGORY
NUMBER
CODE
None
b. PLANNED IN NEXT THREE YEARS
PROJECT
CATEGORY
NUMBER
CODE
TOTAL
Classified
Classified
0
0
0
0
6,000
0
0
6,000
COST
($000)
6,000
DESIGN
START
DESIGN
COMPLETE
PROJECT TITLE
COST
($000)
PROJECT TITLE
COST
($000)
None
10. MISSION OR MAJOR FUNCTION:
NSA/CSS delivers responsive, reliable, effective, and expert Signals Intelligence and Information Assurance products and services, and enables
Network Warfare operations to gain a decisive information advantage for the Nation and our allies under all circumstances
11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES:
A.
AIR POLLUTION
0
B. WATER POLLUTION
0
C. OCCUPATIONAL SAFETY AND HEALTH
0
DD Form 1390, DEC 76
286
UNCLASSIFIED
1. Component
NSA/CSS
DEFENSE
3. Installation and Location
4. Project Title
Classified
Classified Project
5. Program Element
2. Date
FY 2010 MILITARY CONSTRUCTION PROJECT DATA
6. Category Code
7. Project Number
May 2009
8. Project Cost ($000)
14113
6,000
9. COST ESTIMATES
Item
U/M
PRIMARY FACILITIES
Base Administrative Building
Base Barracks
Shooter Booths
Power Building
LS
LS
EA
LS
SUPPORTING FACILITIES
Helicoper Landing Pad
Roads, Parking, curbs
Generators w/ storage
Site Utilities (water, sewer)
ATFP
LS
LS
LS
LS
Quantity
8
Unit Cost
35,000
Cost ($000)
834
(100)
(290)
(280)
(164)
4,416
(250)
(2,991)
(375)
(800)
TOTAL CONTRUCTION COST
Contingency (5%)
SUBTOTAL
SIOH
Total Project Request
5,250
263
5,513
441
5,954
TOTAL PROJECT COST (ROUNDED)
6,000
Equipment & Utilities Provided From Other Appropriations
(0)
10. DESCRIPTION OF PROPOSED CONSTRUCTION: This project provides an administrative building and barracks with shooter
booths and a power building. The administrative building includes modular structural components, finished flooring, ceiling, lighting
and other electrical distribution, rest rooms, and a heating and ventilating system. The barracks include kitchen and rest room
facilities. The shooter booths are bullet–proof construction with exterior lighting and due to their distance from the administrative
building include individual generators and latrine facilities. The administrative building and barracks are supported by a central
electrical generator plant with fuel tanks. Potable water is provided by a well. Extensive roads are required due to the remote location.
The ATFP facilities include hydraulic barricades and fencing with aircraft cable to control vehicle traffic.
This project will be designed in accordance with Antiterrorism Force Protection (ATFP) standards and Unified Facilities Criteria
(UFC).
11. REQUIREMENT: 4980 SF
ADEQUATE: None
SUBSTANDARD: None
PROJECT: Construct administrative building, barracks, and shooter booths with electrical, water, and sewer infrastructure; and
security facilities
REQUIREMENT: This project is required to protect a mission critical facility at a high hazard location.
CURRENT SITUATION: There is no permanent protection for the site leaving it very vulnerable to personnel and vehicular threats.
IMPACT IF NOT PROVIDED: Current mission is very vulnerable to threats and would be temporarily or permanently degraded or
disabled.
DD Form 1391, DEC 76
PREVIOUS EDITIONS MAY BE USED
UNCLASSIFIED
287
UNCLASSIFIED
1. Component
FY 2010 MILITARY CONSTRUCTION PROJECT DATA
NSA/CSS
DEFENSE
3. Installation and Location
4. Project Title
Classified
Classified Project
5. Program Element
6. Category Code
7. Project Number
2. Date
April 2009
8. Project Cost ($000)
14113
6,000
ADDITIONAL:
12. SUPPLEMENTAL DATA:
(a) Status
(i) Date Design Started
(ii) Percent Completed as of Feb 2009
(iii) Date Design Completed
(iv) Type of Design Contract:
(b) Basis
(i) Standard or Definitive Design:
(ii) Date Design was Most Recently Used:
(c) Contract Award
(d) Construction Start
(e) Construction Complete
Nov 2008
35%
Jan 2010
Design-Bid-Build
No
N/A
Jun 2010
Aug 2010
Sep 2011
/s/__________________________
Jeffrey P. Rutt, P.E.
Technical Director, I&L
DD Form 1391, DEC 76
PREVIOUS EDITIONS MAY BE USED
INTERNALLY UNTIL EXHAUSTED
UNCLASSIFIED
288
UNCLASSIFIED
2. DATE
FY 2010 MILITARY CONSTRUCTION PROGRAM
1. COMPONENT
NSA/CSS DEFENSE
May 2009
3. INSTALLATION AND LOCATIONS
4. COMMAND
5. AREA CONSTRUCTION
COST INDEX
NSA/CSS
Various (Planning & Design)
N/A
6. PERSONNEL STRENGTH
Tenant of US ARMY
OFF
PERMANENT
ENL
CIV
A. AS OF
B. END FY
7. INVENTORY DATA ($000)
OFF
STUDENTS
ENL
CLASS
IFIED
CIV
OFF
SUPPORTED
ENL
TOTAL
CIV
A. TOTAL ACREAGE
B. INVENTORY TOTAL AS OF Aug 1999
C. AUTHORIZED NOT YET IN INVENTORY
D. AUTHORIZATION REQUESTED IN THIS PROGRAM
E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM
F. PLANNED IN NEXT THREE YEARS
G. REMAINING DEFICIENCY
H. GRAND TOTAL
8. PROJECTS REQUESTED IN THIS PROGRAM:
PROJECT
CATEGORY
NUMBER
CODE
N/A
0
0
600
0
0
0
600
PROJECT TITLE
COST
($000)
Planning and Design
600
9. FUTURE PROJECTS:
a. INCLUDED IN FOLLOWING PROGRAM
CATEGORY
CODE
b. PLANNED IN NEXT THREE YEARS
CATEGORY
CODE
DESIGN
START
STATUS
COMPLETE
PROJECT TITLE
COST
($000)
PROJECT TITLE
COST
($000)
10. MISSION OR MAJOR FUNCTION
11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES:
A.
AIR POLLUTION
0
B.
WATER POLLUTION
0
C.
OCCUPATIONAL SAFETY AND HEALTH
0
DD Form 1390, DEC 76
PREVIOUS EDITIONS MAY BE USED
INTERNALLY UNTIL EXHAUSTED
UNCLASSIFIED
289
UNCLASSIFIED
1. Component
NSA/CSS
Defense
2. DATE
FY 2010 MILITARY CONSTRUCTION PROJECT DATA
May 2009
3. INSTALLATION AND LOCATION
4. PROJECT TITLE
Various
Planning and Design
5. PROGRAM ELEMENT
N/A
6. CATEGORY CODE
N/A
7. PROJECT NUMBER
N/A
8. PROJECT COST ($000)
$600
9. COST ESTIMATES
ITEM
U/M
QUANTITY
UNIT COST
COST
($000)
Total Planning and Design
600
10. Description of Proposed Construction
Funds are used for preparing plans, specifications, and other A&E services required for developing a complete design package to
include geotechnical services, engineering calculations, project scheduling, and cost estimating
11. Requirement:
The estimated construction cost for the classified military construction project does not include funds for Planning and Design (P&D)
activities. Therefore, a separate P&D amount is required for the accomplishment of the planning and design effort associated with
this project.
12. Supplemental Data:
/s/ ___________________
Jeffrey P. Rutt, NSA
Technical Director, I&L
290
UNCLASSIFIED